What should happen on the last afternoon

Commissioning is the part of an installation that decides how the system performs for the next fifteen years, and it is the part most often skipped — because nobody can see whether it happened.

What commissioning actually is. Once a system is physically installed it still has to be set up: the refrigerant charge adjusted to the manufacturer’s figures for that equipment in that house, the airflow measured and adjusted, the controls configured for how the building is used, and every one of those verified with an instrument rather than by feel. It takes about two hours on a house and it is the last thing on the last day.

Why it goes missing. Not incompetence, usually. A job runs late, a crew has another start in the morning, the customer is hot and wants it on, and everything measurable gets replaced by “it’s cooling nicely”. The system works. It just works at something other than what it was designed to do.

How you can tell. One question: ask for the numbers. A system that was commissioned has a sheet with figures on it. One that was not has an invoice.

Pick where you are and what kind of system it is. Everything below is written out in full.

READ Ductless is the system most often installed with no commissioning at all, and the one where it matters most.

A mini-split arrives with a factory charge for a stated line-set length. Anything longer needs refrigerant added by weight, to a figure the manufacturer publishes — not to a pressure, not to a feeling, and not to whatever is left in the cylinder. If nobody weighed it, nobody knows what is in your system.

The line set has to be evacuated properly first. A deep vacuum, held and verified with a micron gauge, so that air and moisture are out of the pipework before the charge is released. This is the step most often shortened, because it is twenty minutes of a machine running while nobody appears to be working. Moisture left in a system does not announce itself; it damages the compressor slowly and the failure arrives years later looking like bad luck.

Flare connections are the other one. They have a torque figure and a required flare shape, and a joint made by feel will hold for a while and then weep. A ductless system that is low on charge two summers after installation was almost always made, not damaged.

What to ask for: the line-set length, the weight of refrigerant added, the micron reading the vacuum was held at, and the final operating readings. Four numbers. A good installer has them written down already.

A

Thinking about a new system

Then the useful thing to know now, before you speak to anybody, is that commissioning is a thing you can ask for by name, and asking changes the conversation.

Most quotes describe equipment: a brand, a model, an efficiency rating, a price. Very few describe what happens after it is bolted in. When you ask a contractor how they commission a system, you learn a great deal from the shape of the answer — a specific one names measurements, a vague one names the manufacturer.

The other thing worth knowing early: commissioning cannot rescue a system that is the wrong size or connected to ductwork that cannot carry the air. Those are decided before the equipment is chosen. A correctly commissioned oversized system is still oversized. So the order is: load calculation, ductwork assessment, equipment selection, then commissioning — and a contractor who starts at the third step is starting in the middle.

B

Central air with a gas furnace

On the cooling side: superheat and subcooling measured at a steady state, with the target taken from the manufacturer’s data for that equipment and that metering device. Not a pressure, not a rule of thumb, and not the temperature of the air at the register.

On the airflow side: total static pressure measured across the system, blower speed set to deliver the airflow the equipment needs, and the temperature split across the coil checked as a cross-reference.

On the gas side: manifold pressure set, combustion analysed and the figures recorded, the heat exchanger inspected and the flue checked as installed rather than as drawn. This part is a safety item as well as a performance one, and it is the one with a carbon monoxide consequence if it is got wrong.

And the controls: heat and cool stages configured, fan timings set, and the thermostat set up for how the house is actually occupied rather than left on a factory schedule.

DO

The next step

Ask every contractor you speak to how they commission a system. The shape of the answer will separate them faster than the price will. And get the load calculation and the ductwork looked at first — commissioning cannot rescue the wrong size.

END

Where this points at us

We commission our own installations as standard and it is a line item on the quote, priced visibly, so you can compare us honestly to somebody who does not.

We will commission or baseline somebody else’s system as a separate job, and give you the sheet, whether or not anything further follows. If the answer is that it was set up correctly, we will say so and there is nothing to sell you.

What we will not do is tell you the previous contractor was incompetent. Most missing commissioning is a scheduling failure rather than a skill failure, and a measurement is a more useful thing to have than an opinion about somebody who is not in the room.

And we will not promise a percentage. A correctly commissioned system performs better than a badly commissioned one. By how much depends on how badly, which is not a number anybody can print honestly.

Next

The sheet you should already have

A visit, the readings taken properly, and a written commissioning record for the system you already own. It is the baseline every future visit needs, and it belongs to you.